Frac fitting for HF

The frac fitting is designed for sealing the wellhead and the hole annulus, suspension of the pump and compressor tubes string and packer arrangement as well as providing for the process of pumping of the working fluids and mixtures used in the process of carrying out hydraulic fracturing.

The frac fitting for HF is developed and produced according to the requirements specification of the Customer.

Specifications pdf (162 KB)
  • The fitting is distinguished by its compactness, simple design and high reliability.
  • Guaranteed non-failure operating period per one operation is 1200 tons of propane.
  • Working medium: water, oil, oil products, alkali, inhibited acid solutions, propane, cement and clay solutions;
  • Climate version MCC under GOST 15150-69;
  • Placement category I under GOST 15150-69;
  • Ambient temperature -60°С to +40°С;
  • Working medium temperature up to +120°С;
  • Corrosion-proof design: non-corrosive, corrosive К1 and К2.
Advantages
Basic specifications